SPRIT NETWORK https://test.spritnetwork.com Let's grow with sprit Mon, 12 Aug 2024 06:10:18 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 177655765 Sahufan Kariapper Sahufan Kariapper sahufan@spritnetwork.com SPRIT NETWORK https://test.spritnetwork.com/wp-content/uploads/2024/08/sprit-erp.png https://test.spritnetwork.com SPRIT NETWORK Let's grow with sprit false Case Study: Router and Switch Installation and Configuration https://test.spritnetwork.com/portfolio/case-study-router-and-switch-installation-and-configuration/ Sat, 10 Aug 2024 06:53:59 +0000 https://test.spritnetwork.com/?post_type=ot_portfolio&p=8061

Case Study: Router and Switch Installation and Configuration

Introduction

A) Project Background

1. Requirements Analysis :

  • The first phase involved gathering requirements and analyzing the existing network setup. During this stage, I visited the Spritnetwork (Pvt) Ltd and Winsys City Campus Pvt Ltd to understand their current network architecture, identify any gaps, and determine the specific needs for router and switch installation. The analysis revealed the need for a well-organized cabling system, secure mounting of devices, and a configuration plan that would meet the organization’s future expansion goals. The existing setup lacked proper cable management, leading to tangled wires and potential connectivity issues.

2. Design and Concept :

  • The project plan was divided into several key stages:

    • Requirement gathering
    • System layout design
    • Equipment installation
    • Cable management
    • Device configuration
    • Testing and validation

    Throughout the project, regular meetings with stakeholders ensured alignment with the organization’s goals and facilitated smooth progress. The plan also outlined the necessary resources, including hardware, tools, and technical support, to complete each stage effectively.

3. Materials Procurement :

  • The material procurement process began with identifying all necessary components and tools required for the successful installation and configuration of routers and switches. This included networking equipment such as routers, switches, and patch panels, as well as cabling, mounting hardware, and cable management tools. Vendor selection was crucial, focusing on quality, reliability, cost, and delivery timelines. By carefully evaluating vendors, the team ensured that high-quality, reliable materials were sourced efficiently, with considerations for technical support and warranties. Risk management strategies, including supply chain resilience and quality assurance, were also integral to ensuring the smooth procurement and availability of all materials, contributing to the project’s overall success.

Project Scope Statement

A) Define Project Scope

The scope of the project was to install and configure routers and switches within the organization’s existing network infrastructure. This included proper mounting of the equipment, organizing and managing cabling, and configuring the devices to ensure optimal network performance. The scope also encompassed testing the network setup and providing training to the IT staff for ongoing maintenance and troubleshooting.

Key functionalities of the project included secure equipment installation, efficient cable management, proper configuration of routing and switching protocols, and implementation of security measures to protect the network.

B) Project Assumptions and Constraints

Quality

The installation and configuration process was critical to achieving high network performance, ensuring data security, and maintaining user satisfaction.

Resources

The project assumed that adequate resources, including manpower, technical support, and hardware, would be available throughout the implementation process.

Time

The project had a defined timeline, with specific milestones for each stage. However, some adjustments were made to accommodate unforeseen challenges during the installation and configuration process.

Work Breakdown Structure (WBS)

A) Decomposition

The project was broken down into manageable sections: Requirement Gathering, System Layout Design, Equipment Installation, Cable Management, Device Configuration, Testing, and User Training.

B) WBS

Requirement Gathering

Interviews with the organization’s IT staff were conducted to understand their needs and expectations. This phase also involved analyzing the existing network setup and identifying areas for improvement.

System Layout Design

A detailed layout for the equipment rack was created, considering factors such as airflow, accessibility, and future expansion needs. The design ensured that all equipment would be securely mounted and easily maintainable.

Equipment Installation

The installation phase involved securely mounting routers and switches in the designated rack, following best practices to prevent physical damage and ensure stable connections.

Cable Management

Efficient cable management techniques were implemented, including the use of cable ties, trays, and patch panels. All cables were labeled clearly to facilitate easy identification and troubleshooting.

Device Configuration

Routers and switches were configured according to the organization’s network requirements, with a focus on security, performance, and scalability.

Testing

Functional testing of the network setup was conducted to ensure all devices were operating correctly and that the network was stable and secure.

Problems Found

Proper Installation and Mounting of Equipment

Incorrect installation or insecure mounting of networking equipment could lead to physical damage, connectivity issues, and maintenance difficulties.

Managing and Organizing Cabling

Poorly managed cabling could cause network performance issues, complicate troubleshooting, and increase the risk of cable damage.

Solutions

Proper Installation and Mounting

A carefully planned layout design was implemented, considering factors like airflow, accessibility, and future expansion. Secure mounting practices were followed, and all connections were double-checked to avoid issues.

Efficient Cable Management

Cable management techniques, such as using cable ties, trays, and patch panels, were implemented to keep cables organized and minimize tangling. All cables were labeled clearly and consistently, with color-coded cables used for different types of connections where possible.

Outcomes

Enhanced Network Infrastructure

Improved connectivity and reduced downtime through robust router and switch installation.

Effective Cable Management

Organized cabling, reducing risk of damage and simplifying maintenance.

Secure and Scalable Setup

Secure installation allowing for future network expansion without compromising performance.

Hands-On Experience

Gained valuable skills in network installation and configuration.

Staff Training

IT staff equipped with knowledge for ongoing maintenance and troubleshooting.

Positive Feedback

Stakeholders were satisfied with improved network performance and project execution.

Conclusion

The Router and Switch Installation and Configuration project provided invaluable hands-on experience in IT infrastructure management. By overcoming challenges related to equipment installation and cable management, I was able to successfully contribute to the enhancement of the organization’s network performance and security. The project not only improved the operational efficiency of the network but also prepared me for a future career in IT, equipping me with a strong foundation in managing and troubleshooting complex network environments.

Charindu Neshmika

System Administrator

We've been There,
Done That.

All the tasks involved in this project are collaboratively done by Mr.Charindu Neshmika and Ms.Tharaka Liyanage.

Tharaka Liyanage

System Administrator

]]>
8061
Case Study: Lab Setup and Network Management https://test.spritnetwork.com/portfolio/case-study-lab-setup-and-network-management/ Thu, 25 Jul 2024 05:57:18 +0000 https://test.spritnetwork.com/?post_type=ot_portfolio&p=6545

Case Study: Lab Setup and Network Management

Introduction

A) Project Background

1. Requirements Analysis :

  • The project required setting up a functional IT lab environment, which included organizing hardware, configuring network devices, and ensuring proper file sharing and OS installation.

2. Design and Concept :

  • The design focused on creating a well-organized lab with efficient network setup. The concept involved arranging hardware for optimal performance and configuring network devices to ensure seamless connectivity.

3. Plan the Project :

  • The project plan included tasks for hardware setup, network configuration, and troubleshooting. The timeline outlined phases for arranging hardware, setting up the network, and conducting tests.

4. Materials Procurement :

  • Materials included networking hardware (routers, switches, cables), tools for cable management, and software for network configuration and diagnostics.

5. Boxes Production :

  • “Boxes” in this context refer to the physical arrangement of lab equipment and network devices. This involved setting up server racks, organizing cables, and ensuring all devices were properly connected.

6. Boxes Assembly :

  • The assembly involved connecting all hardware components, configuring network devices, and ensuring that all lab equipment was properly installed and functional.

B) Planning Concept and Software

1. Planning Concept :

  • The planning concept involved creating a structured lab setup with organized hardware and efficient network configuration. Key aspects included cable management and network device configuration.

2. External Resources and Software :

  • External resources included network diagnostic tools and cable testing equipment. Software tools were used for configuring and monitoring network performance.

Project Scope Statement

A) Define Project Scope

The scope covered the physical setup of the lab, including hardware arrangement, network configuration, and ensuring connectivity. It also included troubleshooting network issues and optimizing file sharing.

B) Project Assumptions and Constraints

Quality

Assumed that all hardware and network configurations would meet performance and reliability standards. Quality was ensured through careful setup and testing.

Resources

Resources included networking hardware, cable management tools, and personnel for setup and troubleshooting.

Scope

The scope was limited to lab setup and network management, excluding broader IT infrastructure tasks.

Time

The project had a defined timeline for each phase, with deadlines for hardware setup, network configuration, and troubleshooting.

Work Breakdown Structure (WBS)

A) Decomposition

The work was decomposed into tasks such as hardware setup, network configuration, and troubleshooting. Each task was broken down into specific activities.

B) WBS

Hardware Setup

  • Arrange Server Racks

  • Install and Connect Devices

Network Configuration

  • Configure Routers and Switches

  • Set Up IP Addresses and File Sharing

Troubleshooting

  • Diagnose and Fix Network Issues

  • Ensure Connectivity and Performance

Project Schedule

A) Define Project Activities

Activities included user account setup, policy configuration, and testing of the ADDS environment.

B) Estimate Activities Duration

The duration for each activity was estimated based on complexity and required resources, with allowances for troubleshooting.

Charindu Neshmika

System Administrator

We've been There,
Done That.

All the tasks involved in this project are collaboratively done by Mr.Charindu Neshmika and Ms.Tharaka Liyanage.

Tharaka Liyanage

System Administrator

]]>
6545
Case Study: Active Directory Domain Services (ADDS) Implementation https://test.spritnetwork.com/portfolio/case-study-active-directory-domain-services-adds-implementation/ Thu, 25 Jul 2024 04:23:19 +0000 https://test.spritnetwork.com/?post_type=ot_portfolio&p=6455

Case Study: Active Directory Domain Services (ADDS) Implementation

Introduction

A) Project Background

1. Requirements Analysis :

  • The primary requirement was to implement and manage Active Directory Domain Services (ADDS) for lab environments. This included creating user accounts, configuring permissions, and applying group policies to manage user access and system security.

2. Design and Concept :

  • The design involved setting up a structured ADDS environment with clear user roles and permissions. Group policies were designed to standardize user configurations and enhance security across the network.

3. Plan the Project :

  • The project was planned to include phases for account creation, policy implementation, and testing. A timeline was set to ensure each phase was completed efficiently, with checkpoints for reviewing progress.

4. Materials Procurement :

  • Materials included server hardware for ADDS, software tools for configuration and monitoring, and documentation tools to track user settings and permissions.

5. Boxes Production :

  • In this context, “boxes” refer to the conceptual framework of ADDS setup. This included creating user profiles, defining roles, and setting up the infrastructure for managing users.

6. Boxes Assembly :

  • The assembly involved configuring ADDS with user accounts, group policies, and permissions. This step ensured that all components of ADDS were properly integrated and functional.

B) Planning Concept and Software

1. Planning Concept :

  • The planning concept involved creating a structured ADDS environment with role-based access control, regular audits, and clear documentation of user settings and policies.

2. External Resources and Software :

  • External resources included AD management tools and audit software. These tools were used for configuring ADDS, monitoring user activity, and ensuring security compliance.

Project Scope Statement

A) Define Project Scope

External resources included AD management tools and audit software. These tools were used for configuring ADDS, monitoring user activity, and ensuring security compliance.

B) Project Assumptions and Constraints

Quality

Assumed that the ADDS setup would meet industry standards for security and functionality. Quality was ensured through careful configuration and regular audits.

Resources

Resources included hardware for the ADDS server, software tools for configuration, and IT staff for implementation and monitoring.

Scope

The scope was limited to ADDS setup and management within the lab environment, excluding other IT infrastructure tasks.

Time

The project had a defined timeframe for each phase, with deadlines for completing user account setup, policy implementation, and testing.

Work Breakdown Structure (WBS)

A) Decomposition

The work was decomposed into tasks such as user account creation, group policy configuration, and permission setting. Each task was further broken down into specific activities.

B) WBS

User Account Creation

  •  Setup User Profiles
  • Assign Permissions
  • Configure Group Memberships

Group Policy Configuration

  • Define Policies

  • Apply Policies to User Groups

Testing and Validation

  • Verify User Access

  • Conduct Security Audits

Project Schedule

A) Define Project Activities

Activities included user account setup, policy configuration, and testing of the ADDS environment.

B) Estimate Activities Duration

The duration for each activity was estimated based on complexity and required resources, with allowances for troubleshooting.

C) Schedule Activities

Sequence Activities

Activities were sequenced to first create user accounts, then configure policies, and finally test the setup.

Project Original Bar Chart

The original bar chart displayed planned start and end dates for each task.

Project Revised Bar Chart

The revised bar chart reflected any changes or delays encountered during the project, providing an updated timeline.

Resource Management Plan

A) Types of Resources

Resources included server hardware, software tools for AD management, and IT staff for implementation.

B) Quantities of Each Type of Resource

Quantities were determined based on the number of user accounts, policies to be configured, and the scale of the ADDS environment.

Charindu Neshmika

System Administrator

We've been There,
Done That.

All the tasks involved in this project are collaboratively done by Mr.Charindu Neshmika and Ms.Tharaka Liyanage.

Tharaka Liyanage

System Administrator

]]>
6455
Analysis of Security https://test.spritnetwork.com/portfolio/analysis-of-security/ https://test.spritnetwork.com/portfolio/analysis-of-security/#respond Mon, 25 Nov 2019 16:05:22 +0000 http://wpdemo.archiwp.com/onum/?post_type=ot_portfolio&p=1468
Published:
March 11, 2018
Category:
Ideas / Technology
Client:
Oceanthemes

How it Works

M obile apps have already penetrated every sphere of our lives and every imaginable business niche. Naturally, the appeal of mobile apps for its market potential cannot fade away anytime soon, at least until another great technology can replace mobile apps. development company and its business clients. . So, what about the failure of other apps? What are the key factors responsible for the failure of millions of apps? Well, apart from the ill-conceived app idea and development and design flaws many apps simply fail because of their pre-launch and post-launch shortcomings. Front-end development essentially focuses and works on the visual perceptions of a website. It’s about the look, load time, pattern and functionality of the components of a website. Front-End is a mix of programming and layout that powers the visuals and interactions on the web. The talented Front-end developers provide turnkey Front-End development services whether you are planning to change the Front-End from older technology to newer one, for example Angular.
“I cannot give you the formula for success, but I can give you the formula for failure. It is: Try to please everybody.” – Herbert Bayard Swope

Process & Results

But while DevOps as a development approach remained uncontested, the security aspects of the app development process largely remained under the shadow. There was a perception that along with the operations, app security should equally be a part of the development process. With the demand for integrating security with the product life cycle, the DevSecOps approach has emerged. This approach has already proven to play an instrumental role in reducing the security vulnerabilities of the apps. While integrating the security with the DevOps approach has always been of high demand, this requires a completely different range of processes and tools. DevOps is already known to boast of an agile development methodology.

While integrating the security with the DevOps approach has always been of high demand, this requires a completely different range of processes and tools. DevOps is already known to boast of an agile development methodology. Though the companies embracing DevSecOps development methodology are only a few in numbers, in the time to come many companies working with DevOps approach can actually embrace this new methodology for giving their projects.

]]>
https://test.spritnetwork.com/portfolio/analysis-of-security/feed/ 0 1826
Social Media App https://test.spritnetwork.com/portfolio/social-media-app/ https://test.spritnetwork.com/portfolio/social-media-app/#respond Mon, 25 Nov 2019 16:02:01 +0000 http://wpdemo.archiwp.com/onum/?post_type=ot_portfolio&p=1457
Published:
February 05, 2020
Category:
Design / Technology
Client:
Oceanthemes

How it Works

M obile apps have already penetrated every sphere of our lives and every imaginable business niche. Naturally, the appeal of mobile apps for its market potential cannot fade away anytime soon, at least until another great technology can replace mobile apps. development company and its business clients. . So, what about the failure of other apps? What are the key factors responsible for the failure of millions of apps? Well, apart from the ill-conceived app idea and development and design flaws many apps simply fail because of their pre-launch and post-launch shortcomings. Front-end development essentially focuses and works on the visual perceptions of a website. It’s about the look, load time, pattern and functionality of the components of a website. Front-End is a mix of programming and layout that powers the visuals and interactions on the web. The talented Front-end developers provide turnkey Front-End development services whether you are planning to change the Front-End from older technology to newer one, for example Angular.
“I cannot give you the formula for success, but I can give you the formula for failure. It is: Try to please everybody.” – Herbert Bayard Swope

Process & Results

But while DevOps as a development approach remained uncontested, the security aspects of the app development process largely remained under the shadow. There was a perception that along with the operations, app security should equally be a part of the development process. With the demand for integrating security with the product life cycle, the DevSecOps approach has emerged. This approach has already proven to play an instrumental role in reducing the security vulnerabilities of the apps. While integrating the security with the DevOps approach has always been of high demand, this requires a completely different range of processes and tools. DevOps is already known to boast of an agile development methodology.

While integrating the security with the DevOps approach has always been of high demand, this requires a completely different range of processes and tools. DevOps is already known to boast of an agile development methodology. Though the companies embracing DevSecOps development methodology are only a few in numbers, in the time to come many companies working with DevOps approach can actually embrace this new methodology for giving their projects.

]]>
https://test.spritnetwork.com/portfolio/social-media-app/feed/ 0 1823
Your New Reality https://test.spritnetwork.com/portfolio/your-new-reality/ https://test.spritnetwork.com/portfolio/your-new-reality/#respond Mon, 25 Nov 2019 16:01:12 +0000 http://wpdemo.archiwp.com/onum/?post_type=ot_portfolio&p=1455

How It Works

Mobile apps have already penetrated every sphere of our lives and every imaginable business niche. Naturally, the appeal of mobile apps for its market potential cannot fade away anytime soon, at least until another great technology can replace mobile apps. development company and its business clients. . So, what about the failure of other apps? What are the key factors responsible for the failure of millions of apps?

Front-end development essentially focuses and works on the visual perceptions of a website. It’s about the look, load time, pattern and functionality of the components of a website. Front-End is a mix of programming and layout that powers the visuals and interactions on the web. 

Published:
September 18, 2019
Category:
Development
Client:
Oceanthemes
]]>
https://test.spritnetwork.com/portfolio/your-new-reality/feed/ 0 1455
Immersive Experience https://test.spritnetwork.com/portfolio/immersive-experience/ https://test.spritnetwork.com/portfolio/immersive-experience/#respond Mon, 25 Nov 2019 15:59:06 +0000 http://wpdemo.archiwp.com/onum/?post_type=ot_portfolio&p=1453

How It Works

Mobile apps have already penetrated every sphere of our lives and every imaginable business niche. Naturally, the appeal of mobile apps for its market potential cannot fade away anytime soon, at least until another great technology can replace mobile apps development company and its business clients. So, what about the failure of other apps? What are the key factors responsible for the failure of millions of apps? Front-end development essentially focuses and works on the visual perceptions of a website. It’s about the look, load time, pattern and functionality of the components of a website. Front-End is a mix of programming and layout that powers the visuals and interactions on the web.
Published:
September 28, 2019
Category:
Technology
Client:
Oceanthemes
]]>
https://test.spritnetwork.com/portfolio/immersive-experience/feed/ 0 1822
Crypto App Project https://test.spritnetwork.com/portfolio/crypto-app-project/ https://test.spritnetwork.com/portfolio/crypto-app-project/#respond Mon, 25 Nov 2019 15:57:48 +0000 http://wpdemo.archiwp.com/onum/?post_type=ot_portfolio&p=1449

How It Works

Mobile apps have already penetrated every sphere of our lives and every imaginable business niche. Naturally, the appeal of mobile apps for its market potential cannot fade away anytime soon, at least until another great technology can replace mobile apps. development company and its business clients. . So, what about the failure of other apps? What are the key factors responsible for the failure of millions of apps?

Front-end development essentially focuses and works on the visual perceptions of a website. It’s about the look, load time, pattern and functionality of the components of a website. Front-End is a mix of programming and layout that powers the visuals and interactions on the web. 

Published:
December 01, 2019
Category:
Ideas / Technology
Client:
Oceanthemes
]]>
https://test.spritnetwork.com/portfolio/crypto-app-project/feed/ 0 1820